Tuesday, October 18, 2011

STEPS TOWARD A DREAM

 FIRST WAS A WHOLE LOT OF DIGGING TRENCHES FOR WIRES,WATER,ETC.
 NEXT WAS THE FOOTER HOLES. THESE WERE DRILLED. THANK GOODNESS....
 
 MATERIALS ARRIVED AND READY TO GO.

 TWAS A FOGGY DAY, BUT NOT EVEN THE FOG STOPPED THE PROGRESS.

 WITH EACH PASSING HOUR WE SEEM TO GET CLOSER.
 BUILDING FRAMED UP, WINDOWS AND DOORS IN, ROOF ON.....
 SIDING ON, GARAGE DOORS INSTALLED. CONCRETE TO BE PORED TOMORROW.
SOON OH SO SOON THIS DREAM WILL BE REAL. WE STILL HAVE A LOT TO DO, BUT IT IS REALLY GOING TO HAPPEN. THE INSIDE MUST BE FINISHED. THE ELECTRIC WIRING WAS INSTALLED AND PASSED INSPECTION. THE BUILDING WAS ALSO INSPECTED AND PASSED . THE INSIDE FRAMING IS WELL ON THE WAY AND THIS WEEKEND MY SON HARRY WILL INSTALL DUCK WORK AND HVAC UNITS. THE DRYWALL HOPEFULLY WILL START NEXT WEEK. I AM THINKING BY MID NOVEMBER WE WILL BE FINISHED. KEEP YOUR FINGERS CROSSED FOR ME.... IT WILL BE COLD SOON....